Helix Center Renovations

The Project generally consists of the west lobby renovation; Growth Farm renovations and HVAC improvements; relocating specific electrical equipment to a new electrical room; HVAC additions for the new electrical room; limited first floor finishes; two (2) dry labs and five (5) labs with sinks on the second floor; new boiler pipe insulation; repairs to RTU1; removal and replacement of RTU2; a new loading/unloading area; vestibule door hardware improvements; and exterior improvements associated with the Growth Farm HVAC equipment
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
000001 - TOC_ADD1 133.2 KB
015000 - TEMPORARY FACILITIES AND CONTROLS_ADD1 150.2 KB
237416.13 - PACKAGED ROOFTOP AIR CONDITIONING UNITS - ABOVE 25 TON_2025.06.19 ADD 01 171.6 KB
A0.0_ADD1 953.5 KB
A0.5_ADD1 7.7 MB
A10.0_ADD1 236.2 KB
Addendum 1 Narrative 89.2 KB
H000_ADD1 185.6 KB
Helix Center RFI Questions and Answers 55.0 KB
Helix Phase Plan Narrative 31.9 KB
P000_ADD1 192.2 KB
Pre Bid Registration List 1.7 MB
Revised Appendix H-Helix Center Bid Template.xls 66.0 KB
V000_ADD1 187.8 KB