Helix Center Renovations
The Project generally consists of the west lobby renovation; Growth Farm renovations and HVAC improvements; relocating specific electrical equipment to a new electrical room; HVAC additions for the new electrical room; limited first floor finishes; two (2) dry labs and five (5) labs with sinks on the second floor; new boiler pipe insulation; repairs to RTU1; removal and replacement of RTU2; a new loading/unloading area; vestibule door hardware improvements; and exterior improvements associated with the Growth Farm HVAC equipment
Addendum 1
(click to expand/collapse)

Name | Size | ||
000001 - TOC_ADD1 | 133.2 KB | ||
015000 - TEMPORARY FACILITIES AND CONTROLS_ADD1 | 150.2 KB | ||
237416.13 - PACKAGED ROOFTOP AIR CONDITIONING UNITS - ABOVE 25 TON_2025.06.19 ADD 01 | 171.6 KB | ||
A0.0_ADD1 | 953.5 KB | ||
A0.5_ADD1 | 7.7 MB | ||
A10.0_ADD1 | 236.2 KB | ||
Addendum 1 Narrative | 89.2 KB | ||
H000_ADD1 | 185.6 KB | ||
Helix Center RFI Questions and Answers | 55.0 KB | ||
Helix Phase Plan Narrative | 31.9 KB | ||
P000_ADD1 | 192.2 KB | ||
Pre Bid Registration List | 1.7 MB | ||
Revised Appendix H-Helix Center Bid Template.xls | 66.0 KB | ||
V000_ADD1 | 187.8 KB |