J.S. McDonnell Culvert Replacement (AR-1850)

Project consists for replacement of two elliptical pipe culverts, construction of concrete headwalls, reconstruction of portions of the paved ditch adjacent to the headwalls, sidewalk removal and replacement, and construction of concrete curb ramps and other incidental items along James. S. McDonnell Blvd. at Byassee Dr. and a commercial entrance within Hazelwood, MO.
Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download to registered users. Log in now
Order files below, price will be calculated by SQFT
Name Size
AR-1850 Final Plans 1 1.3 MB
AR-1850 Final Plans 2 794.5 KB
AR-1850 Final Plans 3 198.3 KB
AR-1850 Final Plans 4 173.4 KB
AR-1850 Final Plans 5 3.1 MB
AR-1850 Final Plans 6 561.8 KB
AR-1850 Final Plans 7 1.1 MB
AR-1850 Final Plans 8 179.9 KB
AR-1850 Final Plans 9 117.9 KB